Progress Photo

Overview for Shop lots Elemen Utara KK (March 2024)

Overview for Shop lots Elemen Utara KK (March 2024)

Overview for Shop lots Elemen Utara KK (March 2024)

Escalator to 1st floor shop lots.

Shop lots elevator from ground floor to 2nd floor.

Overview Presint 2 Elemen Utara KK Tower B

Shell Jalan Tuaran Bypass (January 2024)

Shell Jalan Tuaran Bypass (January 2024)

Shell Jalan Tuaran Bypass (January 2024)

Shell Jalan Tuaran Bypass (January 2024)

McDonald’s Jalan Tuaran Bypass (January 2024)

McDonald’s Jalan Tuaran Bypass (January 2024)

McDonald’s Jalan Tuaran Bypass (January 2024)

McDonald’s Jalan Tuaran Bypass (January 2024)

Drone views of Elemen Utara KK

Drone views of Elemen Utara KK

Drone views of Elemen Utara KK

Landscaping work in progress

Shop lots landscaping work in progress

Overview for Shop lots Elemen Utara KK (November 2023)

McDonald’s Jalan Tuaran Bypass (November 2023)

Shell Jalan Tuaran Bypass (November 2023)

Installation glass balustrade for first floor shop lots

Overview for Shop lots Elemen Utara KK

Overview for Presint 2 Tower B (Currently top floor)

Top structural level for Tower B completed

Top structural level for Tower B completed

McDonald’s Jalan Tuaran Bypass (August 2023)

McDonald’s Jalan Tuaran Bypass (August 2023)

McDonald’s Jalan Tuaran Bypass (August 2023)

Shell Jalan Tuaran Bypass (August 2023)

Shell Jalan Tuaran Bypass (August 2023)

July 2023

Overview for Presint 2 Tower B (Currently 21st floor)

June 2023

Overview for Presint 2 Tower B (Currently 19th floor)

 

May 2023

Overview for Presint 2 Tower B (currently 16th floor)

April 2023

Overview for Presint 2 Tower B Concrete work for level 11 tower B Concrete work for level 11 tower B

February 2023

Concrete work for level 9 Tower B Presint 2 Elemen Utara

January 2023

Concrete work for level 8 Tower B Presint 2 Elemen Utara

December 2022

Overall general view structural wall in progress tower B

Formwork for rebar laying works in level 5 tower B Rebars work in progress Rebars work in progress Rebars work in progress

July 2022

Tower B Transfer Floor Column and Beam (before Level 5 Apartment begins)

Tower B Transfer Floor Column and Beam (before Level 5 Apartment begins)

Tower B Transfer Floor Column and Beam (before Level 5 Apartment begins)

Tower B Transfer Floor Column and Beam (before Level 5 Apartment begins)

Tower B Transfer Floor Column and Beam (before Level 5 Apartment begins)

Tower B Transfer Floor Column and Beam (before Level 5 Apartment begins)

June 2022

Tower B overview site.

Column rebar & formwork in progress.

 

 

 

April 2022

Tower B mobilisation work in progress.

 

March 2022

Tower B mobilisation work in progress.

 

December 2021

Overview for Elemen Utara KK Presint 2 from swimming pool area.

Elemen Utara KK logo installation at courtyard area.

Overview for Elemen Utara KK Tower A from courtyard area.

 

 

 

November 2021

Overview for Elemen Utara KK Presint 2

Playground installation completed.

Basketball court floor paint coating completed.

 

 

 

October 2021

Overview of the site.

Overview Tower A from Basketball Court.

 

 

September 2021

Overview for Elemen Utara KK Presint 2

Playground installation work in progress.

 

August 2021

Overview for Elemen Utara KK Presint 2

Overall view for Elemen Utara KK Presint 2

June 2021

Kitchen cabinet installation type 1B (Pearl Series)

Kitchen & wardrobe cabinet installation type 1A studio room (Pearl Series)

Kitchen & wardrobe cabinet installation type 1B studio room (Pearl Series)

Kitchen cabinet installation type 1A (Pearl Series)

Kitchen cabinet installation type 1C (Pearl Series)

Kitchen & wardrobe cabinet installation type 1A studio room (Zen Series)

Kitchen cabinet installation type 1A (Zen Series)

Kitchen cabinet installation type 1B (Zen Series)

Kitchen & wardrobe cabinet installation type 1B studio room (Zen Series)

May 2021

Overview for Elemen Presint 2

Landscaping work in progress

Elemen Utara KK signage

Road work completed

April 2021

Overview for Elemen Presint 2

Rooftop view

Parking lot marking work in progress

Floor timber laminating installation

Floor Skirting installation in progress

February 2021

Overview for Elemen Presint 2

Landscaping work in progress

Landscaping work in progress

Podium view

January 2021

Overview for Elemen Presint 2

Road Work in progress

Security post in progress

Floor laminating work in progress

Landscaping work in progress

 

29 September 2020

Overview of the site from jogging track.

Overview of Tower A from swimming pool area.

The podium area.

View of the podium.

External drainage work in progress.

30 August 2020

Overview of the site.

External drainage work in progress.

Overview of the facility centre.

Gymnasium room work in progress.

15th July 2020

Overview for Elemen Utara KK Presint 2

18th June 2020

Overview of Tower A from podium.

Overview of Tower A from swimming pool area.

Swimming pool area in progress.

Facility area in progress.

Side pole landscape in final progress.

Landscaping podium area in progress.

 

18th March 2020

Overview of the site

Balancing tank foundation work in progress

Jogging track road base work in progress.

Landscaping work in progress.

20th February 2020

Overview for Elemen P2

Installation of the passenger glass lift in progress.

Installation of the staircase louver completed.

80% completion for the internal building painting work.

 

29th January 2020

Overview Tower A from fitness amenities floor.

Podium area.

Swimming pool in progress.

Swimming pool in progress.

Over view of Presint 2

Over view of Presint 2

Over view of Presint 2

Elemen Presint 2 rooftop view

Elemen Presint 2 rooftop view

Elemen Presint 2 rooftop view

Elemen Presint 2 rooftop view

Elemen Presint 2 rooftop view

Elemen Presint 2 rooftop view

 

16th December 2019

Overview

Fitness amenities area

Overall view of the podium

Basketball court flooring work in progress

Swimming pool tiling work in progress

6th November 2019

Overview.

Sewerage treatment plant (STP) work in progress.

Carpark painting work in progress.

Podium work in progress.

 

5th October 2019

Overview.

Sewer pipe work in progress.

Construction sewerage treatment plant (STP) in progress.

Landscaping in progress.

 

6th September 2019

Overview.

Carpark floor screeding work in progress

External drainage work in progress

 

2nd August 2019

Overview.

Swimming pool water piping work.

Painting on podium 3rd & 4th floor.

External drainage work.

 

20th June 2019

Brickwork @ staircase in progress.

Lift lobby tiling work

Overview of the site

 

9th April 2019

Commercial shop lot external wall plastering work in progress

12 March 2019

Electrical wiring work has been progressed up to 17th floor

Aluminium frame work has been progressed up to 16th floor

Floor tiling work has been progressed up to 16th floor

Site overview

11 December 2018

Floor tiles, Window frame & Plaster ceiling installation work in progress

Window frame installation work in progress (9th floor)

Plaster ceiling installation work in progress (10th floor)

Overview of the site

6th September 2018

Amneties floor slab (future gym + swimming pool)

 

1st August 2018

20th floor slab rebar & formwork in progress.

21st Floor View

Overview of site

2nd July 2018

17th floor slab rebar & formwork in progress.

Overview of site

1st June 2018

14th floor slab rebar & formwork in progress.

Overview of site

7th May 2018

12th floor slab rebar & formwork in progress.

2nd April 2018

10th floor slab casted.

Overview of site

1st March 2018

Commercial shop ground beam’s rebar & formwork in progress.

Commercial shop ground slab’s lean concrete casted

Overview of site

1st February 2018

7th floor slab rebar & formwork in progress.

Overview of site

5 January 2018

6th floor slab casted

1 December 2017

Commercial shop ground floor slab casted

1 November 2017

2nd Floor slab rebar & formwork in progress

1 October 2017

Ground floor slab rebar & formwork in progress.

2nd floor slab rebar & formwork in progress.

1 September 2017

Ground floor slab concrete casting work in progress

1st floor slab casted (partial).

1 August 2017

Ground beam, slab & column work in progress.

1 July 2017

Ground beam, ground slab & ground column in progress.

1 June 2017

Ground beam, ground slab & retaining wall in progress.

16 May 2017

Ground beam, ground slab & earth back-filling works in progress.

20 April 2017

Ground beam concrete casting & rebar works in progress.

27 March 2017

Overall site view

Steel bar fabrication in progress

Concrete mixing in progress

Contractor site office

 

25 November 2016

Column stump casted

11 May 2016

Pile Cap Casting in progress

17 April 2016

Site Preparation

18 March 2016

Site Preparation